Testimonial | Hart Design & Construction | A 9 month long project was 6 months over

Written by LetsBuild

Follow us

img

Share this story

Lean ebook cover

A nine month long project was 6 months over schedule. The reason I went with LetsBuild is to stop that from happening in the future. The level of transparency between teams that LetsBuild brings ensures this doesn’t happen again.